{"id":64951,"date":"2026-02-04T10:57:59","date_gmt":"2026-02-04T10:57:59","guid":{"rendered":"https:\/\/logisticsbusiness.com\/?p=64951"},"modified":"2026-02-04T10:57:59","modified_gmt":"2026-02-04T10:57:59","slug":"entrance-and-loading-bay-systems-for-new-facility","status":"publish","type":"post","link":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/","title":{"rendered":"Entrance and Loading Bay Systems for New Facility"},"content":{"rendered":"\n<p>ASSA ABLOY has supplied and installed a comprehensive range of loading bay equipment and industrial doors at a new \u00a342 million advanced manufacturing facility developed for Schneider Electric in Scarborough, North Yorkshire.<\/p>\n\n\n\n<p>Delivered by Caddick Construction, the state-of-the-art smart facility was developed to support Schneider Electric\u2019s strategic expansion in the UK. The development was designed to be a net zero carbon facility in Scope 1 and Scope 2 emissions, with sustainability features such as renewable energy sources and an intelligent building management system.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Philip Whiteley, High Speed Door &amp; Docking Sales Manager at ASSA ABLOY explains: \u201cThis project required a carefully specified approach to loading bay safety, access control and fire protection across a modern manufacturing environment. Our role was to deliver entrance and loading bay systems that met Schneider Electric\u2019s operational and regulatory requirements, whilst integrating smoothly with the wider building design and construction programme.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p><a href=\"https:\/\/www.assaabloy.com\/uk\/en\/solutions\/products\/industrial-doors-and-docking\" type=\"link\" id=\"https:\/\/www.assaabloy.com\/uk\/en\/solutions\/products\/industrial-doors-and-docking\">ASSA ABLOY<\/a> supplied and installed four fully equipped loading bays. Each bay features the new Crawford OH114P dual drive dock doors, DL6120T telescopic lip dock levellers, dock shelters, wheel guides, hardened rubber buffers, and integrated internal and external traffic light systems designed to clearly signal the current door status to both vehicle and forklift drivers.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1300\" height=\"867\" src=\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-1300x867.jpg\" alt=\"\" class=\"wp-image-64952\" srcset=\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-1300x867.jpg 1300w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-700x467.jpg 700w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-768x512.jpg 768w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-1536x1024.jpg 1536w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-058-2048x1365.jpg 2048w\" sizes=\"(max-width: 1300px) 100vw, 1300px\" \/><\/figure>\n\n\n\n<p>The facility incorporates a series of loading bays alongside operational areas that require controlled access and certified <a href=\"https:\/\/logisticsbusiness.com\/category\/warehousing\/safety\/\" type=\"link\" id=\"https:\/\/logisticsbusiness.com\/category\/warehousing\/safety\/\">fire protection<\/a>. ASSA ABLOY was engaged to supply and install the entrance and loading bay systems required to support safe, efficient day-to-day operation.<\/p>\n\n\n\n<p>The loading bay specification was developed to support safe and reliable operation across a wide range of delivery conditions. Dock shelters enable vehicles to be loaded and unloaded in all weathers, whilst the wide operating range of the telescopic dock levellers allows the facility to accommodate the full range of delivery vehicles expected on site. The Crawford OH114P dock doors were selected to reduce ongoing maintenance requirements through their Dual Drive design, which removes the need for traditional door springs.<\/p>\n\n\n\n<p>For additional safety during loading and unloading, all bays are fitted with automatic vehicle restraint systems, reducing the risk of premature vehicle departure while operations are underway.<\/p>\n\n\n\n<p>Across the wider facility, 23 RR5000 rigid high speed doors were installed in a combination of internal and external locations. Designed to support efficient movement of materials across the site, the doors can open in as little as three seconds and feature enhanced thermal insulation. Each door is configured for controlled entry via a remote control transmitter, together with radar for presence detection of pedestrian and vehicle traffic.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1300\" height=\"867\" src=\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-1300x867.jpg\" alt=\"\" class=\"wp-image-64953\" srcset=\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-1300x867.jpg 1300w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-700x467.jpg 700w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-768x512.jpg 768w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-1536x1024.jpg 1536w, https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-029-2048x1365.jpg 2048w\" sizes=\"(max-width: 1300px) 100vw, 1300px\" \/><\/figure>\n\n\n\n<p>Fire protection formed a key part of the overall entrance strategy. ASSA ABLOY supplied and installed nine tube motor fire roller shutters with a one-hour fire rating, along with three geared drive fire roller shutters rated for two hours. All fire shutters are fully tested and certified to BS EN 1634-1:2014 + A1:2018, with audio-visual warning panels provided to support safe operation. The fire-rated shutter systems were installed where required to help protect both personnel and the building in the event of a fire.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Clement Grunwald, Plant Director, commented: \u201cThe project demonstrates ASSA ABLOY\u2019s expertise in delivering state-of-the-art access doors and loading bay equipment installations for advanced manufacturing environments, combining safety, regulatory compliance, and coordinated delivery across a major new-build facility.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ASSA ABLOY has supplied and installed a comprehensive range of loading bay equipment and industrial doors at a new \u00a342 million advanced manufacturing facility developed for Schneider Electric in Scarborough, North Yorkshire. Delivered by Caddick Construction, the state-of-the-art smart facility was developed to support Schneider Electric\u2019s strategic expansion in the UK. The development was designed [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":64954,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[27,26],"tags":[18173,23507,24823,9773,8001,24824,15289],"class_list":["post-64951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-loading-bay","category-warehousing","tag-assa-abloy","tag-assa-abloy-entrance-systems","tag-caddick-construction","tag-dock-shelters","tag-doors","tag-entrance-and-loading-bay","tag-schneider-electric"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Entrance and Loading Bay Systems for New Facility - Logistics News<\/title>\n<meta name=\"description\" content=\"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Entrance and Loading Bay Systems for New Facility\" \/>\n<meta property=\"og:description\" content=\"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Logistics Business\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-04T10:57:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2400\" \/>\n\t<meta property=\"og:image:height\" content=\"1600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"David Priestman\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@LogisticsBizz\" \/>\n<meta name=\"twitter:site\" content=\"@LogisticsBizz\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"David Priestman\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\"},\"author\":{\"name\":\"David Priestman\",\"@id\":\"https:\/\/logisticsbusiness.com\/#\/schema\/person\/2e5c51581f1773e9c5420e5679d01fb0\"},\"headline\":\"Entrance and Loading Bay Systems for New Facility\",\"datePublished\":\"2026-02-04T10:57:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\"},\"wordCount\":546,\"publisher\":{\"@id\":\"https:\/\/logisticsbusiness.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg\",\"keywords\":[\"Assa Abloy\",\"ASSA ABLOY Entrance Systems\",\"Caddick Construction\",\"dock shelters\",\"doors\",\"Entrance and Loading Bay\",\"Schneider Electric\"],\"articleSection\":[\"Loading Bay and Doors\",\"Warehousing\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\",\"url\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\",\"name\":\"Entrance and Loading Bay Systems for New Facility - Logistics News\",\"isPartOf\":{\"@id\":\"https:\/\/logisticsbusiness.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg\",\"datePublished\":\"2026-02-04T10:57:59+00:00\",\"description\":\"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more\",\"breadcrumb\":{\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage\",\"url\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg\",\"contentUrl\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg\",\"width\":2400,\"height\":1600,\"caption\":\"Entrance and Loading Bay\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/logisticsbusiness.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Entrance and Loading Bay Systems for New Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/logisticsbusiness.com\/#website\",\"url\":\"https:\/\/logisticsbusiness.com\/\",\"name\":\"Logistics Business\",\"description\":\"News, Podcast, Magazine and More\",\"publisher\":{\"@id\":\"https:\/\/logisticsbusiness.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/logisticsbusiness.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/logisticsbusiness.com\/#organization\",\"name\":\"Logistics Business\",\"url\":\"https:\/\/logisticsbusiness.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/logisticsbusiness.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2025\/05\/LBM-Logo-No-Background.png\",\"contentUrl\":\"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2025\/05\/LBM-Logo-No-Background.png\",\"width\":1480,\"height\":168,\"caption\":\"Logistics Business\"},\"image\":{\"@id\":\"https:\/\/logisticsbusiness.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/LogisticsBizz\",\"https:\/\/www.linkedin.com\/company\/10935951\",\"https:\/\/www.youtube.com\/channel\/UCdcOSSVUUxuPRcoOQOVAfXg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/logisticsbusiness.com\/#\/schema\/person\/2e5c51581f1773e9c5420e5679d01fb0\",\"name\":\"David Priestman\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/logisticsbusiness.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a4f47f36f8a2555f173594ddeeb92970552af1ff888a32475a27751e70bc0c60?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a4f47f36f8a2555f173594ddeeb92970552af1ff888a32475a27751e70bc0c60?s=96&d=mm&r=g\",\"caption\":\"David Priestman\"},\"gender\":\"Male\",\"url\":\"https:\/\/logisticsbusiness.com\/author\/david-priestman\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Entrance and Loading Bay Systems for New Facility - Logistics News","description":"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/","og_locale":"en_GB","og_type":"article","og_title":"Entrance and Loading Bay Systems for New Facility","og_description":"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more","og_url":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/","og_site_name":"Logistics Business","article_published_time":"2026-02-04T10:57:59+00:00","og_image":[{"width":2400,"height":1600,"url":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg","type":"image\/jpeg"}],"author":"David Priestman","twitter_card":"summary_large_image","twitter_creator":"@LogisticsBizz","twitter_site":"@LogisticsBizz","twitter_misc":{"Written by":"David Priestman","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#article","isPartOf":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/"},"author":{"name":"David Priestman","@id":"https:\/\/logisticsbusiness.com\/#\/schema\/person\/2e5c51581f1773e9c5420e5679d01fb0"},"headline":"Entrance and Loading Bay Systems for New Facility","datePublished":"2026-02-04T10:57:59+00:00","mainEntityOfPage":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/"},"wordCount":546,"publisher":{"@id":"https:\/\/logisticsbusiness.com\/#organization"},"image":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg","keywords":["Assa Abloy","ASSA ABLOY Entrance Systems","Caddick Construction","dock shelters","doors","Entrance and Loading Bay","Schneider Electric"],"articleSection":["Loading Bay and Doors","Warehousing"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/","url":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/","name":"Entrance and Loading Bay Systems for New Facility - Logistics News","isPartOf":{"@id":"https:\/\/logisticsbusiness.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage"},"image":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg","datePublished":"2026-02-04T10:57:59+00:00","description":"Entrance and Loading Bay installation at new Schneider Electric factory built by Caddick features dock shelters, levellers and more","breadcrumb":{"@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#primaryimage","url":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg","contentUrl":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg","width":2400,"height":1600,"caption":"Entrance and Loading Bay"},{"@type":"BreadcrumbList","@id":"https:\/\/logisticsbusiness.com\/warehousing\/loading-bay\/entrance-and-loading-bay-systems-for-new-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/logisticsbusiness.com\/"},{"@type":"ListItem","position":2,"name":"Entrance and Loading Bay Systems for New Facility"}]},{"@type":"WebSite","@id":"https:\/\/logisticsbusiness.com\/#website","url":"https:\/\/logisticsbusiness.com\/","name":"Logistics Business","description":"News, Podcast, Magazine and More","publisher":{"@id":"https:\/\/logisticsbusiness.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/logisticsbusiness.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/logisticsbusiness.com\/#organization","name":"Logistics Business","url":"https:\/\/logisticsbusiness.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/logisticsbusiness.com\/#\/schema\/logo\/image\/","url":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2025\/05\/LBM-Logo-No-Background.png","contentUrl":"https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2025\/05\/LBM-Logo-No-Background.png","width":1480,"height":168,"caption":"Logistics Business"},"image":{"@id":"https:\/\/logisticsbusiness.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/LogisticsBizz","https:\/\/www.linkedin.com\/company\/10935951","https:\/\/www.youtube.com\/channel\/UCdcOSSVUUxuPRcoOQOVAfXg"]},{"@type":"Person","@id":"https:\/\/logisticsbusiness.com\/#\/schema\/person\/2e5c51581f1773e9c5420e5679d01fb0","name":"David Priestman","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/logisticsbusiness.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a4f47f36f8a2555f173594ddeeb92970552af1ff888a32475a27751e70bc0c60?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a4f47f36f8a2555f173594ddeeb92970552af1ff888a32475a27751e70bc0c60?s=96&d=mm&r=g","caption":"David Priestman"},"gender":"Male","url":"https:\/\/logisticsbusiness.com\/author\/david-priestman\/"}]}},"rttpg_featured_image_url":{"full":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg",2400,1600,false],"landscape":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg",2400,1600,false],"portraits":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg",2400,1600,false],"thumbnail":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018-300x300.jpg",300,300,true],"medium":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018-700x467.jpg",700,467,true],"large":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018-1300x867.jpg",640,427,true],"1536x1536":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018-2048x1365.jpg",2048,1365,true],"rt_custom":["https:\/\/logisticsbusiness.com\/wp-content\/uploads\/2026\/02\/Schneider-Electric-Scarborough-018.jpg",2400,1600,false]},"rttpg_author":{"display_name":"David Priestman","author_link":"https:\/\/logisticsbusiness.com\/author\/david-priestman\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/logisticsbusiness.com\/category\/warehousing\/loading-bay\/\" rel=\"category tag\">Loading Bay and Doors<\/a> <a href=\"https:\/\/logisticsbusiness.com\/category\/warehousing\/\" rel=\"category tag\">Warehousing<\/a>","rttpg_excerpt":"ASSA ABLOY has supplied and installed a comprehensive range of loading bay equipment and industrial doors at a new \u00a342 million advanced manufacturing facility developed for Schneider Electric in Scarborough, North Yorkshire. Delivered by Caddick Construction, the state-of-the-art smart facility was developed to support Schneider Electric\u2019s strategic expansion in the UK. The development was designed&hellip;","_links":{"self":[{"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/posts\/64951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/comments?post=64951"}],"version-history":[{"count":1,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/posts\/64951\/revisions"}],"predecessor-version":[{"id":64959,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/posts\/64951\/revisions\/64959"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/media\/64954"}],"wp:attachment":[{"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/media?parent=64951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/categories?post=64951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/logisticsbusiness.com\/wp-json\/wp\/v2\/tags?post=64951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}